A building-material project rarely begins with a perfect specification. More often, the first useful information is a floor plan, BOQ, room dimension, product list or reference image. The quality of the next decision depends on how those pieces are connected.
Start with the project information, not a product list
The first question is not only what to buy. It is where the material belongs, what it must work with and when it needs to be ready. A useful starting scope usually records:
-
the rooms, units or areas included in the current release;
-
the quantities and dimensions available at this project stage;
-
the material, finish and visual direction already agreed;
-
the drawings, schedules or references that still need confirmation.
One project record is more useful than several disconnected product conversations.
Connect the decisions that affect one another
A kitchen cabinet decision may affect the countertop, appliance schedule, lighting and room circulation. A door decision may affect openings, flooring, hardware and delivery sequencing. This is why the Products pages explain material categories while the Solutions pages organize those categories around a project context.
A practical review sequence
-
Review the available plans, BOQ, dimensions and project location.
-
Group the relevant categories by room, system or repeated unit.
-
Confirm the materials, finishes, interfaces and missing references.
-
Record the approved information before production release.
Useful starting point: if the drawings are incomplete, send the information that exists and identify what is still being decided.

Use a clear reference before production
Production should follow an agreed reference appropriate to the category. That reference may include drawings, dimensions, materials, finish samples, colors, hardware and revision notes. The exact approval set changes by product and project, but the principle stays the same: the production team should not have to interpret an unrecorded decision.
| Project input | Why it matters | Useful examples |
|---|---|---|
| Floor plan | Locates rooms, openings and circulation. | Plans, elevations, room schedule |
| BOQ or material list | Frames categories, quantities and priorities. | Room-by-room list, RFQ, item schedule |
| Material references | Sets the visual and technical direction. | Samples, images, finishes, hardware |
| Project context | Frames sequence and delivery requirements. | Location, stage, timeline, budget direction |
Follow the information through production and delivery
After approval, the working method can continue through project review, design coordination, production follow-up, quality checks, packing and international delivery. Package references, room labels and packing-list linkage can help the receiving team recognise what arrives, where applicable.